Lbl-lighting 2-Circuit MO Direct Feed Standoff for Surf Xfmr Manual de usuario

Busca en linea o descarga Manual de usuario para Encendiendo Lbl-lighting 2-Circuit MO Direct Feed Standoff for Surf Xfmr. LBL Lighting 2-Circuit MO Direct Feed Standoff for Surf Xfmr User Manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 4
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
Installation Instructions for
1.0
HANGERDIRADJ-_1-2
980MR2SPSMT
1
GP I :ENERAL RODUCT NFORMATION
This product is suitable for indoor dry locations only.
This product is intended to be used with LBL Surface Mount
Transformers and 2-Circuit Monorail system only.
Telescoping Rigid Standoff for Surface Mount Transformers
Install the Rigid Standoffs
2-Circuit Monorail
ANCHOR
Select a location on the ceiling where the 2-Circuit Monorail is
to be mounted.
One way of marking the standoff locations on the ceiling is to
lay the 2-Circuit Monorail on the floor underneath of the
selected location and by using a plumb bob pointing on the
center of the 2-Circuit Monorail, mark the points on the
ceiling.
The other way is to hold the 2-Circuit Monorail directly
against the ceiling and mark the standoff points on the ceiling.
Tap the anchors at the marked points up to the threaded
portion with a hammer.
Screw the anchors in the rest of the way with a Phillips
screwdriver.
Insert the #8 screw into the threaded nipple and washer.
Tighten the #8 screw completely into the anchor to secure the
washer and threaded nipple.
Repeat step 4 through 6 for the remaining standoffs.
ANCHOR
WASHER
#8 SCREW
THREADED NIPPLE
CAUTION: This standoff is not applicable with
vaulted ceilings.
CEILING
1B
1A
1
2
3
4
6
5
4
6
1B
1A
5
7
1B1C
Vista de pagina 0
1 2 3 4

Indice de contenidos

Pagina 1 - Install the Rigid Standoffs

Installation Instructions for1.0HANGERDIRADJ-_1-2980MR2SPSMT1GP I :ENERAL RODUCT NFORMATIONThis product is suitable for indoor dry locations only.This

Pagina 2 - Adjust the Standoff Height

Push the standoff rod completely into the support post andtighten the M4 set screw with the 2 MM Allen wrench.Repeat steps 8 through 10 for the remain

Pagina 3

Install the 2-Circuit Monorail to Standoffs3Remove the housing cap on all standoffs.HOUSING CAPPlace a section of the 2-Circuit Monorail into standoff

Pagina 4 - SAVETHESE INSTRUCTIONS!

47400 Linder Ave, Skokie, IL 60077800.323.3226 - 847.626.6300www.lbllighting.com© 2014 LBL Lighting.All rights reserved.The "LBL Lighting"

Comentarios a estos manuales

Sin comentarios